India’s Trust Layer for Construction & Interior+91 90288 66922hello@slabinto.com
Slabinto
Start Your Project
Construction progress
WORK FLOW

Six stages from first call to handover — who does what, what you sign, and what protects you at each one.

01

Project brief & plot details

Share your plot dimensions, location, approvals status, and vision. We map the scope before anything begins.

You do this≈ 10 minutes
02

Design & feasibility consult

A Slabinto architect reviews setbacks, FAR, and your wish-list, then flags what’s buildable before you spend on drawings.

Slabinto guides2–4 days
03

Verified contractor matching

We shortlist 3–5 verified contractors with relevant villa experience. No spam, no cold calls — you talk to them in the app, not on your phone.

Slabinto guides48 hours
04

Compare quotes & agree scope

Review structured proposals side-by-side on platform. Lock in milestones, payment terms, and accountability clauses.

Together1–2 weeks
05

Milestone-based execution tracking

Foundation → structure → roof → finishes. Track every stage with documented updates, site photos, and escrow releases.

Slabinto guidesWhole build
06

Snag list & documented handover

Joint walkthrough, snag closure with retention held back, then your full vault: drawings, warranties, bills, inspection reports.

Together2–3 weeks
Who is responsible for whatWho signs the agreement, who inspects each stage, who holds the money, and who answers after handover.
STAGE 04 · ON PLATFORM

Same scope, same units, same brands — so the cheapest number isn’t automatically the best deal. Pick a card to see the difference.

Meghana BuildersA+
₹1.42 Cr₹3,380 / sqft · 16 months
Civil & structure₹78.4 LFinishes₹41.0 LMEP₹22.6 L
Cement brand locked (UltraTech)7 milestones, 10% retention
Slabinto pick
Sriram ConstructionsA+
₹1.51 Cr₹3,595 / sqft · 14 months
Civil & structure₹81.2 LFinishes₹44.8 LMEP₹25.0 L
Waterproofing warranty 10 yrs9 milestones, 12% retention
Anvi InfraA
₹1.29 Cr₹3,070 / sqft · 19 months
Civil & structure₹74.0 LFinishes₹35.5 LMEP₹19.4 L
Finishes allowance, not fixed5 milestones only

You’ve selected Sriram Constructions — ₹22L above the cheapest quote and ₹9L above Meghana — but 5 months faster, with a 10-year waterproofing warranty and finishes fixed rather than allowanced.

Get my own quotes
STAGE 05 · ON PLATFORM

Each milestone needs site photos, an engineer sign-off, and your approval before escrow releases.

BANER 4BHK · SRIRAM CONSTRUCTIONS₹62.4 L released of ₹1.51 Cr
41% complete
Foundation & plinth14 photos · engineer report · approved 12 Mar
₹22.6 LReleased
Ground floor RCC22 photos · cube test results · approved 28 May
₹39.8 LReleased
First floor slabAwaiting your approval · 18 photos uploaded 2 days ago
₹31.5 LReview
04
Brickwork & plasterScheduled Oct 2026
₹26.2 LUpcoming
05
Finishes & handover10% retention held 90 days post-handover
₹31.0 LUpcoming

What does Slabinto cost me?+
Will contractors call me directly?+
What if a contractor goes off-track mid-project?+
Can I bring my own architect or contractor?+