Site footage from our partner firms’ own projects — line-out day, slab day and handover day. This is partners’ earlier work, shown as the standard we look for, not projects delivered through Slabinto.
100+Projects complete
₹100Cr+Scope contracted
93%Milestones on time
9Pune localities
Figures cover work delivered by Slabinto and by partner firms in our network, as of September 2026.
ON SITE
Realsites,filmedstagebystage
From line-out day to slab day to the griha pravesh. Play any card to watch it with sound.
0:25Design
Render to realityThe 3D design beside the brick-jaali facade it became
0:57Homeowner
Happy clientsTwo families on their finished home
1:04Finishing
Old house to G+1, AnturliA mud-wall house rebuilt as a finished bungalow
0:37Homeowner
Bare walls to griha praveshFrom marking up empty rooms to the first pooja
0:23Structure
Slab casting, KumbharkhadeConcrete lift, mixer and crew on pour day
1:03Homeowner
Mother and daughterOn their new bedroom and living-room interiors
0:21Design
New site, BhusawalDrawings handed over, columns rising
0:20Homeowner
The owner’s walkthroughChecking the stone-clad facade with the architect
0:32Structure
Footings, KolkataExcavation and footing rebar
1:57Homeowner
The whole familyA living-room conversation about their home
0:53Design
Line-out, KarkiFrom the render on paper to lines on the ground
0:38Homeowner
Interior fit-out, FopnarCeilings, panelling and flooring going in
0:16Structure
Slab pour, BurhanpurConcrete going onto the reinforcement
0:29Finishing
Hospital-cum-residenceA site visit at plaster stage
0:49Homeowner
On the plotClients with the architect at their site
0:35Structure
Footing inspectionChecking column cages before concrete
0:40Design
Design to siteRender on screen, walls on site, an evening check
0:16Structure
Slab reinforcementThe rebar grid before the pour
0:36Design
New site line-outMarking the plan onto a fresh plot
1:14Finishing
A day of site visitsOffice, the drive, and inspections on site
Yourprojectcouldbenextonthispage
Share your plot and vision — you’ll have a shortlist of verified contractors in 48 hours.